|
|
||
![]() |
![]() |
|
| Landscape
topography was constructed in high-density foam and coated in natural
materials to simulate a jungle dig-site. |
A
mix of artifical and live plants are incorporated with rocks and props
to enhance the interactive experience. |
|
![]() |
||
| The
entire installation was constructed at DCM's facilities and piece by piece
transported to its final installation. The custom made dinosaur skelton
was unassembled and buried in sand pits created by the foam topography.
The "bones" where later unearthed by children in a simulated
archeological dig. After the week long event, the entire installation
was disassembled and the 2500 square foot room was ready for the next
event. |
||
| Photo credits: all photos DCM Fabrication, Inc. | ||
|
|
||